Trench and slot excavation by suction

Narrow, clean-sided trenches for new cables, ducts and small-diameter pipe, cut along routes that already carry live services.

Call +971 58 597 9613

Suction excavator beside a road with its hose working in a narrow trench

Up to 150 m³

Excavated per day

180°

Boom sector without moving the truck

10 / 12 m³

Spoil tank on the truck

Less to reinstate

Narrow, neat trench

When is suction the right way to cut a trench?

When the route already has services in it. A new duct through an existing utility corridor crosses cables, pipes and fibre every few metres. An excavator has to stop at each one. Suction keeps going, because the air exposes each crossing without touching it.

What does the trench look like?

Narrow and clean-sided, cut only as wide as the new service needs. Narrower trenches mean less asphalt or paving to break out and less to make good.

The spoil is lifted straight into the tank on the truck. There are no heaps along the road, no skip on site and no dust plume.

What do you trench for?

  • New power and telecom ducts through existing corridors
  • Micro-trenching for fibre on new and existing routes
  • Small-diameter water, gas and irrigation pipe
  • Earthing and lighting cable runs inside live plants and substations
  • Apron cable trenches at airports and ports

How fast is it?

The Q20 excavates up to 150 m³ per day and its boom works a 180° sector without the truck moving, so a long section is opened from one parking position before the truck moves up.

Questions and answers

Trench and slot excavation: the short answers.

Is suction trenching faster than hand digging?

Yes. One machine excavates up to 150 m³ per day with fewer people in the trench.

Can you trench across existing cables and pipes?

Yes. That is where suction is used: the air exposes each existing service at the crossing without touching it.

Where does the spoil go?

Into the tank on the truck. It is tipped back as backfill or taken to the disposal point agreed in the quote.

Do you reinstate the surface?

We backfill and compact the trench. Surface reinstatement is agreed in the quote.

Machines for this work

All equipment →

Related pages

All services →

Get a quote

Tell us where, what and when.

A location, a photo and what is buried there is enough to start. Quotes are returned within the working day.